Data center siting snapshot: Morrow County, Oregon
What public records show about building a data center in Morrow County: local and state data center rules, mapped high-voltage lines and the utilities on record. Every line links its source.
Line miles are measured from the archived HIFLD Transmission Lines layer inside the Census county boundary. Mapped lines are not available capacity.
What the public record shows
The archived HIFLD map indicates approximately 113.3 miles of 230 kV and above transmission line within Morrow County, comprising 61.7 miles at 500 kV or more and 51.6 miles at 230 kV [1]. An additional 139.2 miles of 115–161 kV line are mapped in the area [2]. Bonneville Power Administration, Umatilla Electric Cooperative Association, and Pacificorp hold the most mapped 115 kV and above line miles [3]. Seven named line endpoints, typically substations or switchyards, touch the higher voltage lines inside the county [4]. Retail electric utilities with service territories covering part of the county include Bonneville Power Administration, Columbia Basin Electric Cooperative, Umatilla Electric Cooperative Association, and Pacificorp, though these boundaries are approximate [5].
As of November 9, 2026, records show no county or city-level data center moratorium or ordinance for Morrow County [6]. At the state level, the POWER Act tariff for large data centers is in force, dated July 8, 2026 [7]. Oregon enacted HB 4084 in April 2026, which creates a Joint Permitting Council and restricts enterprise-zone treatment for data centers [8]. HB 3546, enacted in July 2025, establishes a separate PUC service classification for large energy use facilities [9]. Two bills, HB 3698 and SB 553, both dated June 27, 2025, failed to pass [10][11].
Drafted by our local model from the numbered facts below, then checked sentence by sentence by a second model and a rules-based check.
Data center rules on record
| Jurisdiction | Record | Status | Date | Source |
|---|---|---|---|---|
| Portland General Electric | POWER Act tariff for 20 MW+ data centers | in force | 2026-07-08 | Oregon PUC: approves PGE rate updates (higher bills for data centers) |
| Oregon | HB 4084 (2026) | enacted | 2026-04-06 | HB 4084 (2026 Regular Session) - Measure Overview - OLIS; HB 4084 (2026) - Measure History - OLIS |
| Oregon | HB 3546 (2025) | enacted | 2025-07-07 | HB 3546 (2025 Regular Session) - Measure Overview - OLIS; HB 3546 (2025) - Measure History - OLIS |
| Oregon | HB 3698 (2025) | failed | 2025-06-27 | HB 3698 (2025 Regular Session) - Measure Overview - OLIS; HB 3698 (2025) - Measure History - OLIS |
| Oregon | SB 553 (2025) | failed | 2025-06-27 | SB 553 (2025 Regular Session) - Measure Overview - OLIS; SB 553 (2025) - Measure History - OLIS |
Rule records come from The MW Desk legislation tracker, which includes rows from the Moratorium Nation dataset by Michael J. Bommarito (CC BY 4.0). Statuses change; confirm with the jurisdiction's own record.
Utilities on record
Bonneville Power Administration, Columbia Basin Electric Cooperative, Umatilla Electric Cooperative Association, Pacificorp. (HIFLD/EIA-861 territory polygons; approximate and often overlapping.)
Market context on The MW Desk: Oregon: Hillsboro / Portland + The Dalles.
Sources
- [1] The archived HIFLD map shows about 113.3 miles of 230 kV-and-above transmission line inside Morrow County, OR: 61.7 miles at 500 kV or more, 0.0 miles at 345 kV and 51.6 miles at 230 kV. Source: HIFLD Transmission Lines (archived by SeerAI, CC BY 4.0)
- [2] The same map shows about 139.2 miles of 115–161 kV line in the county. Source: HIFLD Transmission Lines (archived by SeerAI, CC BY 4.0)
- [3] Owners of record with the most mapped 115 kV+ line miles in the county: Bonneville Power Administration, Umatilla Electric Cooperative Association, Pacificorp. Source: HIFLD Transmission Lines (archived by SeerAI, CC BY 4.0)
- [4] 7 named line endpoints touching 230 kV+ lines (usually substations or switchyards) are mapped inside the county. Source: HIFLD Transmission Lines (archived by SeerAI, CC BY 4.0)
- [5] Retail electric utilities whose mapped service territory covers part of the county include: Bonneville Power Administration, Columbia Basin Electric Cooperative, Umatilla Electric Cooperative Association, Pacificorp. Territory boundaries are approximate. Source: HIFLD Electric Retail Service Territories (EIA-861 based; archived by SeerAI, CC BY 4.0)
- [6] Our records hold no county- or city-level data center moratorium or ordinance for Morrow County as of 2026-11-09. Source: The MW Desk legislation tracker
- [7] Oregon state/utility level, Portland General Electric: POWER Act tariff for 20 MW+ data centers (Data center rates up about 29% on average and residential down 1.3%, with minimum demand charges, exit fees and a clean-energy interconnection queue). Status: in force, dated 2026-07-08. Source: Oregon PUC: approves PGE rate updates (higher bills for data centers)
- [8] Oregon state/utility level, Oregon: HB 4084 (2026) (Creates a Joint Permitting Council and fast-track permitting program for eligible economic development projects. As enacted, it also restricts enterprise-zone treatment for data centers: the extended exemption period may not apply to qualified property used in operating a data center, flexible hiring alternatives do not apply to data center property, and an eligible business firm may not be authorized for property co). Status: enacted, dated 2026-04-06. Source: HB 4084 (2026 Regular Session) - Measure Overview - OLIS
- [9] Oregon state/utility level, Oregon: HB 3546 (2025) (Creates a separate PUC service classification and tariff for large energy use facilities using or able to use 20 MW or more and primarily engaged in NAICS 518210 services; requires cost allocation or direct assignment to prevent unwarranted cost shifting to other customers; requires 10-year-plus contracts and minimum payment obligations; requires biennial PUC reports through 2035). Status: enacted, dated 2025-07-07. Source: HB 3546 (2025 Regular Session) - Measure Overview - OLIS
- [10] Oregon state/utility level, Oregon: HB 3698 (2025) (Would require data centers to report quarterly water and electricity use to state agencies, require ODOE to publish summaries, and direct EQC to adopt emissions standards for standby generators used at data centers). Status: failed, dated 2025-06-27. Source: HB 3698 (2025 Regular Session) - Measure Overview - OLIS
- [11] Oregon state/utility level, Oregon: SB 553 (2025) (Would require ODOE to study data center power usage and report findings and possible legislation to interim energy committees by 2026-09-15; sunset 2027-01-02). Status: failed, dated 2025-06-27. Source: SB 553 (2025 Regular Session) - Measure Overview - OLIS